Saturday 6 July 2013

New delivery to the EJ&KLR...

The OBB delivered the recently refurbished EJ&KLR no. 2 to Alisendorf for unloading. The shunter was loaded on a flat wagon for transport due to it's low maximum speed, which would have been an obstruction out on the mainline...

No comments:

Post a Comment