Saturday 27 April 2013

Post winter maintenance...

Can you believe it is last November since I last used the outdoor line (http://ejklr.blogspot.co.uk/2012/11/autumn-on-line.html). The right of way had no maintenance all winter and the snow and heavy rain have taken their toll on the ballast.

So before we ran trains today Elly and I re-ballasted about half the line... We did run some trains but the heavens opened which was good for bedding in the fresh ballast but did stop play!









No comments:

Post a Comment